A 300-tonne cable and pipe lay system will shortly be delivered to McDermott International Inc. The SURF (subsea umbilical riser and flowline) installation market is expanding and pushing into ever-deeper waters. At the same time IHC Engineering Business (IHC EB) has seen a dramatic expansion of its range of pipe and cable lay systems, with a number of large scale projects delivered, or ongoing.
[Read more]
Source: Hydro-International
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment