Guam drydock, “Machinist”, successfully refloated

RESOLVE Marine Group has successfully raised and refloated the “Machinist” drydock at Guam Shipyard in Apra Harbor, Guam. The 825 ft drydock sank on January 2, 2011 during a rough weather event.   The salvage began on January 31 and successfully refloated the drydock on March 3.
[Read More]
Source: gCaptain

No comments:

Post a Comment

 
Paimo Blogs